Simulated workplaceCAQA Deepridge Resources is a fictional business created by CAQA for training and assessment. It is not a real company and no person, client or record here is real.About this simulation
RIICAQA DeepridgeSimulated workplace
Simulated workplace
Communications

Notice board

What the business is telling its staff this month.

Safety

Ramp 4 high potential incident, positive communication reminder

On 7 September a light vehicle entered the ramp 4 haul road without calling up and came within 20 metres of a loaded haul truck. Nobody was hurt because the truck operator stopped. Every light vehicle must call and receive acknowledgement before entering a haul road or approaching within 50 metres of heavy plant. The investigation is under way and findings will be shared at prestart.

8 September 2026

Operations

North dump tension crack, dump closed

A tension crack has been found 3 metres behind the crest of the north dump. The dump is closed to all plant and people until the geotechnical inspection is complete. Dumping is diverted to the east dump. Do not remove the barricades. Report any further cracking, settlement or seepage to the shift supervisor immediately.

9 September 2026

Compliance

Shotfirer licence renewals and blast training

Several explosives licences and blast crew authorisations fall due in October and November. Check your entries in the Training and Authorisation Matrix and lodge your renewal with Ngaire at least six weeks before expiry. The blast crew refresher on the misfire procedure runs on 23 September at the open cut training room.

5 September 2026

Event

Quarterly emergency drill, Wattle Creek

The Wattle Creek quarterly emergency drill will be held on 30 September during day shift. The scenario will not be announced. All personnel must respond to the site alarm as if it were real: stop and park plant, proceed to your muster point and wait for the muster warden. The drill will be reviewed at prestart the next day.

3 September 2026

People

Mine health scheme medicals due

Periodic health monitoring under the mine health scheme is due for open cut workers whose last medical was more than three years ago. Appointments are available at the site medical centre on roster days through October. Hearing, lung function and dust exposure checks are included. Book through your supervisor and bring your previous results if you have them.

10 September 2026