Simulated workplaceCAQA Deepridge Resources is a fictional business created by CAQA for training and assessment. It is not a real company and no person, client or record here is real.About this simulation
RIICAQA DeepridgeSimulated workplace
Simulated workplace
Business profile

About Deepridge

To extract, process, drill and build safely and efficiently so that every worker goes home unharmed, every customer gets what they ordered and every site is left in good condition.

Head office and Wattle Creek Quarry, Hunter Valley region, New South WalesDeepridge open cut mine, Bowen Basin region, QueenslandDrilling and civil depot, Toowoomba region, Queensland
Our story

CAQA Deepridge Resources

CAQA Deepridge Resources is a mid-sized resources and infrastructure company. It operates a hard rock quarry at Wattle Creek producing road base, aggregates and manufactured sand, an open cut coal mine in the Bowen Basin producing thermal coal for export, a drilling services division that carries out exploration, water bore, geotechnical and horizontal directional drilling, and a civil infrastructure division that builds and maintains haul roads, drainage, pavements and mine site infrastructure. Customers include state road authorities, local councils, larger mining houses, utilities and civil contractors across New South Wales and Queensland.

The company runs six departments across its three sites: Surface Extraction Operations, Processing Plant, Drilling Services, Civil Infrastructure, Plant and Maintenance, and Health, Safety, Environment and Training. The open cut runs two twelve-hour shifts, seven days a week, on a seven-days-on, seven-days-off roster with a fly-in fly-out and drive-in drive-out workforce. The quarry works day shift Monday to Saturday with a night crushing shift during peak road construction season. Drilling crews mobilise to client sites for two to four weeks at a time and civil crews work on projects from the Toowoomba depot.

Deepridge operates under the mine safety and health laws of both states, the general work health and safety laws, the explosives laws and its environmental authorities. Every site has a safety management system with principal hazard management plans, a permit to work and isolation system, mobile plant prestart checks, a hazard and incident register and a training and authorisation matrix that controls who can operate what. Fitness for work is managed through drug and alcohol testing and fatigue rules. Inspectors from the state resources regulators visit each site, and the company reports high potential incidents and environmental exceedances as the law requires.

Founded1994
Size310 staff and long-term contractors across three sites
IndustryMining, quarrying, drilling and civil infrastructure
StatusSimulated entity, not registered
Values

What we stand for

Nobody gets hurt

We plan every task, control every hazard and stop the job when the controls are not in place.

Do it right

We follow the procedure, the permit and the plan, and we fix the procedure when it is wrong rather than working around it.

Respect the ground

We manage dust, noise, water and rehabilitation as carefully as production, because the community and the land outlast the mine.

Straight talk

We report hazards, incidents and mistakes early and honestly so they can be fixed before someone is harmed.

Compliance

The rules we work under

The simulated business follows the real laws, standards and regulators of its industry, so the documents and scenarios reflect genuine obligations.

  • Work Health and Safety Act 2011 and Work Health and Safety Regulation 2011
  • Work Health and Safety (Mines and Petroleum Sites) Act 2013 (New South Wales)
  • Mining and Quarrying Safety and Health Act 1999 and Coal Mining Safety and Health Act 1999 (Queensland)
  • Explosives Act 1999 (Queensland) and the Australian Explosives Code
  • Environmental Protection Act 1994 (Queensland) and Protection of the Environment Operations Act 1997 (New South Wales)
  • Resources Safety and Health Queensland and the New South Wales Resources Regulator

Locations (fictional)

  • Head office and Wattle Creek Quarry, Hunter Valley region, New South Wales
  • Deepridge open cut mine, Bowen Basin region, Queensland
  • Drilling and civil depot, Toowoomba region, Queensland
Clients and partners

Who we work with

Every client and partner named on this site is invented for the simulation.

Bowen Basin Coal AllianceWattle Shire CouncilHunter Roads ConsortiumNorthern Rivers Water UtilityBlackwater Exploration GroupCallide Civil Constructions
Simulated workplace. CAQA Deepridge Resources is fictional. It has no ABN, licences, premises or employees. See About this simulation.